Bigger versions of the pictures can be seen if you click on the thumbnails.
The excavators turn up
The excavators turn over the first sod
The basement excavation starts
The boss makin' sure everything is to her specs.
End of the day and the excavation is well under way
Afterwards; getting the septic drainfield finished and ready for inspection
Coupling the easyflo units

Finished & ready for backfilling
DAY 2: The model version

The calm before the work
Later; the garage basement down to grade
House basement almost finished excavation
Our pickup and trailer after delivering the formwork timber [lumber] and sewer and drain pipes, next to our new low road round the bottom of the house. I like and will get them to consolidate and use it to get around the low side. it was built mostly for getting the septic tank in tomorrow.