| Inside: pulling the cable from the main external breaker box to the interior house panel - the beginning |
| Inside: pulling the cable from the main external breaker box to the interior house panel - the the end |
| House panel |
| Outside: Main panel and the small solar production meter |
| And the mud: oh joy NOT |
| The all important green tag: good to go for the next step, actually having the mains power connected |
| Uncovering the water pipe to the house in anticipation of connecting it and the spark to the well and well-pump. More digging in mud. |