Elizabeth hard at work
| Routing done for the fireplace flue |
| Beginning 360 degree view of the framing between main and bedroom floors, starting looking towards back gate: SW direction going clockwise |
| Hidden work of adding blocks and bracing for toilet flanges, fans, bathtubs etc etc |
| Subfloor material covered: waiting for more rain. It's July in Oregon: enough already! |