Making sure no more rain-induced falls of clay from the cut, including putting in the permanent perimeter drains for the foundations.

Ezy-flow perforated pipe and surrounding styrofoam "tile".


The geo-textile draped into the cut; it will eventually just keep the drain from silting up. The gap will by filled with crushed rock.

E carrying the 30 m [100 ft] by 6 m [20 ft] poly.

Draped to keep the rain and water off and out.


A month earlier; a bit of a change.

A bit of trenching to help.

Finishing touches

On to the next job
No comments:
Post a Comment